婷婷综合久久中文字幕_丰满的熟妇岳中文字幕_亚洲AV无码专区在线厂_真实国产乱子伦精品一区二区三区||www.payhere.cn,国内精品自在自线视频香蕉伦伦影院精品一区_91免费国产高清在线_狠狠色综合色综合网站嗯_国产麻豆91欧美一区二区_久久国产精品99久久久久久老狼_久久人精品免费特级黄毛片||www.licaiwang.org.cn ,99久久国产精品免费一区二区_无套内谢少妇毛a片a片免费_a片多多免费观看高清影经典版_亚洲精品无码一区二区卧室||www.3shine.cn ,亚洲国产成人精品久久久,国产成人久久综合一区77,999精品久久久中文字幕,国产精品videossex久久,亚州高清国产av视频,亚洲欧美综合久久久,18末成年禁止进入免费看,久久精品国产精品亚洲艾草网||www.xingjun-tech.cn

Operating procedures for gantry machining center

Date:03-20    Belong to:Company News
Operating procedures for gantry machining center - Check if all power switches, buttons, and function keys are normal - After entering the program flow, carefully check the CNC lathe machining code
Before starting, carry out a comprehensive and delicate inspection of the CNC lathe, including the control panel, slide surface, lathe chuck, lathe tool holder, tool table, CNC blade, etc. Only after confirming accuracy can actual operation be carried out< Br/>


1. After the CNC lathe is powered on, check whether all power switches, buttons, and function keys are normal and flexible, and whether there are any abnormal situations in the CNC lathe< Br/>


2. After entering the program flow, carefully check the CNC lathe machining code, detailed address, standard value, absolute value symbol, and decimal places< Br/>


3. Properly and accurately measure and calculate the plane coordinates of steel components. And conduct verification of personal income results& Amp; Nbsp& Middle; Type in the plane coordinates of the steel component and align the coordinates. Carefully check plane coordinates, absolute value symbols, and decimal places



4. Before installing the steel parts, conduct a program process by air freight to see if the program process can proceed smoothly, whether the installation of CNC blades and fixtures is effective, and whether there is a&quo; Overtravel< Br/>


5. When cutting, quickly fold the power switch and make sure to set it to the minimum gear< Br/>


6. When drilling down the tool, when the CNC blade operates to a distance of 30-50mm from the steel part, it is necessary to verify whether the remaining values of the Z-axis and X-axis coordinates are consistent with the production and processing program flow while maintaining the tool path< Br/>


7. In drilling and production processing, after cutting and replacing CNC blades, it is necessary to accurately measure the position of the CNC blade again and change the tool compensation value and number< Br/>


8. After making changes to the sequence, it is necessary to carefully verify some of the changes< Br/>


9. The CNC lathe can only be started after confirming the clamping of the steel parts. It is prohibited to accurately measure or touch the steel parts during rotation< Br/>


10. When there are abnormal phenomena such as steel parts shaking, shaking, abnormal noises, and loose fixtures during production, it is necessary to park the vehicle to solve them< Br/>


11. After emergency parking, the CNC lathe should be operated again; Return to Zero; Only through practical operation can the program process be operated again< Br/>
nine hundred
logo
Scan the QR code, follow the official account for more information

Contact:Mr.zhou

Mobile:13924586646

Telephone:0755-29423909

Email:sz_jdsk@163.com

Address:Bright new district of shenzhen hai westfield neighborhood community fourth industrial zone 6 area A house

Branch address: No. 199 Longshan Road, Ma'anshan Economic and Technological Development Zone/Office: No. 1399 Sufu Road, Xukou Town, Wuzhong District, Suzhou City, Jiangsu Province
Shenzhen carved CNC Equipment Co., Ltd. Copyright ICP 14057583 
疏附县| 海丰县| 曲沃县| 洞头县| 德庆县| 临海市| 彩票| 洪湖市| 华容县| 将乐县| 巴林左旗| 茌平县| 洪泽县| 应城市| 营口市| 突泉县| 绥棱县| 英山县| 米林县| 凤庆县| 海口市| 鲁甸县| 柳江县| 黄浦区| 理塘县| 榕江县| 廊坊市| 巢湖市| 即墨市| 安康市| 黄冈市| 绍兴市| 六枝特区| 镇江市| 茶陵县| 泉州市| 蒙城县| 宾阳县| 呼和浩特市| 石屏县| 蛟河市|